We’ve heard of payments being lost because they are not sent properly. DO NOT put your payment in GVCA’s brown mailbox – it is against Federal law, do not drop in the blue mailbox without a stamp, and do not hand your payment to GVCA employees or board members. GVCA accepts electronic payments sent by… Read more »
Parking lot will close for landscaping Friday, July 11, 2025. PLEASE Do Not Walk on the seeded areas. The parking lot will re-open as soon as the seeding is complete, definitely in time for the Dive-in Movie Friday night. The landscaping will finish the parking lot by filling in and seeding the gaps behind all… Read more »

The July Newsletter is posted with upcoming events, including a summary of the annual GVCA Owner meeting. Reminder – your GVCA semi-annual assessment of $265 was due July 1, pay by July 15 to avoid a late fee. See below to have a safe and fun 4th of July holiday: Fireworks Safety – Ohio has… Read more »

If you see this gentleman walking around Greenwood, do not be concerned. He is from the Enbridge Gas Company and is doing a survey of all the gas meters on the property. Apparently, the spinning gismo on the top can create a 3D image of the property, allowing them to update their maps.

The Parking Lot’s final top-coat of pavement was put down Wednesday morning and the parking lines were painted Friday morning. All that is left is the landscaping. We will open the parking lot to light traffic today, Friday, June 20, at 3 pm. PLEASE, Do Not Park Trailers or Heavy Trucks on the new asphalt…. Read more »
The parking lot will be closed Monday, 6/16/2025, for installation of the fabric layer and the final top coat of asphalt and will stay closed for several days to ensure the asphalt hardens enough to park on it without making depressions. Please Do Not Park on Village Club Road Monday or Tuesday between Village Parkway… Read more »
The June Newsletter was mailed, which includes a list of events (like the Dive-in Movie Party, Friday, June 13), the Ballot for the Monday, June 23, Greenwood Owners Meeting, along with the bill for your GVCA Semi-Annual Assessment. On July 1 the amount of $265 is due, made payable to “GVCA”. It is for the… Read more »
6/6/25 Update – The Parking Lot, Tennis Courts, and Outdoor Pool Entrance are Open. On Tuesday, the asphalt plant broke down as the contractor was close to finishing Phase 4, the base leveling coat. We opened the parking lot Wednesday but had to close it again Wednesday afternoon when asphalt plant was repaired and the… Read more »

The Greenwood Village outdoor pool will open Tuesday, June 3rd. As the main parking lot is still under construction, please park along Village Club Rd. or Village Parkway. Use the Garden Room entrance to access the outdoor pool. Summer Season Open Swim Hours: Mon: 10:30 AM – 9:00 PM Tue: 10:30 AM – 9:00 PM… Read more »
Phase 3 – The parking lot is closed for asphalt removal and base installation. The contractor has completed the new concrete curbs and drainage. The corroded conduit to the parking lot lights is being replaced, so there may be no lighting at night. Please use caution and do not enter the parking lot or construction… Read more »






